Week 76 | 75 | 74 | 73 | 72 | 71 | MAR | 70 | 69 | 68 | 67 | 66 | 65 | 64 | 63 | JAN 2017 | 62 | 61 | 60 | 59 | 58 | 57 | 56 | 55 | NOV | 54 | 53 | 52 | 51 | 50 | 49 | 48 | 47 | 46 | SEP | 45 | 44 | 43 | 42 | 41 | 40 | 39 | 38 | JUL | 37 | 36 | 35 | 34 | 33 | 32 | 31 | 30 | MAY | 29 | 28 | 27 | 26 | 25 | 24 | 23 | 22 | 21 | MAR | 20 | 19 | 18 | 17 | 16 | 15 | 14 | 13 | JAN 2016 | 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | NOV | 4 | 3 | 1&2 | SEP 26 2015 | Archives


Search this site Full results


Fri 4-7-2017. Pavilion II Academical Village stick top valence velcro-backed to blinds. Half-dozen won't fit, to be trimmed down

Install several large signs at Engineering Way, Millmont.

Wilsdorf pallets to break down into dumpster for Monday.


Thu 4-6-2017. 1071 Pinn (Jordan) Hall(8 hours). 5 days from 1-30 to 2-3 Week 67. "Wed 2-1-2017. Jordan 1071. Day 3. White asbestos in 2 locations behind duct...in a hollow and narrow gap where vertical down T-intersection. Gap between duct and wall is bridged with styrofoam strips and FSK tape. Gap between duct and corrugated ceiling cellulose is stuffed with rock wool. Duct extends into an adjacent room." (6 a.m. Pinn Hall install plastic barriers for plumbers asbestos above drop ceiling.)(4-5 calendar, miscommunication)

Stormy Day.


Wed 4-5-2017. Install/repair/replace various signs.


Tue 4-4-2017. Help install more signs at Medical Center.

New safety shoes from Redwing Truck. Shoe bureaucracy sent e-mail notice of 90-day window. Create project to collect activity for display.

Create project name "Leave overtime same week" to collect all the comments and activity to a timeline. My plan eventually is to import this site to MicroSoft Project format. (4-4 comment) Last night's e-mail to the timekeepers. They respond by phone 8 a.m. today. 40 hours is definition of a work-week. Also if timesheet says 32 hours straight time and 8 hours overtime, you're actually paid 40 hours straight time. If that's the case, my leave has been taken without any compensation, not the half-price from time-and-a-half. 3 p.m. Meeting with Manager. Human Resources are researching an official policy. "Leave Overtime same pay week" e-mail 4-3-2017.


Mon 4-3-2017. Thornton steam tunnel Stadium Road at JPA 2x 2 glovebags asbestos pipe insulation for May shutdown. Create project. Close project.

Help install signs at Medical Center.

Payroll problem again starting this pay period. Manager won't honor 40-hour work week IRS definition because new AIM interface makes it too difficult to correct. Human Resources never heard of AIM but said time should be corrected. I need to go back to my manager. I explained the reason I came to HR is the manager has become a brick wall on this issue. So I have to write another email to HR and get an official letter to address unintended effects of Leave and Overtime in same pay week. This time since May 2016 I have documented the policy to treat flexible schedule as fixed academic, by accounting for hours not worked instead of letting the software function properly. Here's my calendar comment (3-31) New talk that AIM (payroll interface) won't accomodate university-required flexible schedules, won't balance weekdays off with weekend work. Sometimes 40 hours counts as 8 hours overtime and 8 hours leave if your schedule was Tuesday thru Saturday. This only occurs because management over-ride the software to make the schedule fit into non-flexible Mon–Fri format. Timesheets.


Payday 4-21. PP8. Leave 142 start. Comp 6 start. Timesheets.

1st Week Apr  3 || M 8 | T 8 | W 8 | Th 8 | F 8 || Sa|Su = 40 Hours.

2nd Week Apr 10 || M   | T   | W   | Th   | F   || Sa|Su =


Home | Training | Calendar
Week 76 | 75 | 73 | 72 | 71 | 70 | 69 | 68 | 67 | 66 | 65 | 64 | 63 | 62 | 61 | 60 | 59 | 58 | 57 | 56 | 55 | 54 | 53 | 52 | 51 | 50 | 49 | 48 | 47 | 46 | 45 | 44 | 43 | 42 | 41 | 40 | 39 | 38 | 37 | 36 | 35 | 34 | 33 | 32 | 31 | 30 | 29 | 28 | 27 | 26 | 25 | 24 | 23 | 22 | 21 | 20 | 19 | 18 | 17 | 16 | 15 | 14 | 13 | 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 1&2 | Archives