Fri 9-2-2016. Old Medical School MED 4766. Two glovebags removed so 4 copper lines can be cut and capped. Prepare to remove asbestos pipe insulation...mag lines and mag elbows with black mastic and a few white elbows. Wrap in plastic or tape. Entire pipe to be cut out. The remaining glovebags to create space to cut the pipe are to be monitored by EHS.

Help Sign Shop prepare for football game 3:30 kickoff Saturday with Richmond Spiders. Installed the blue rope and some stakes, eyelets, dog-catchers at Clark Hall, Kerchof, Engineering, Bonnie Castle, Forestry, Cemetery.


Thu 9-1-2016. Chemistry 142. In hiatus until remaining phases (floor tile/mastic and mag joints) are scheduled. Neg Air #1 stays on site.

Old Medical School MED 4766. The 6 glovebags below 3 radiators are complete. Pipe insulation includes black mastic, white mag elbows/joints and lines, fiberglass. MASTIC holds 2 surfaces together (vynil tile on floor). Sometimes it's painted, black or white, to seal a surface from losing fibers. MAG is the compound packed around a pipe elbow joining 2 lines of any type of insulation. MAG is also the hard asbestos insulation on linear pipes. Both Mastic and Mag imply asbestos. AB is jargon that simply means Asbestos.


Wed 8-31-2016. Chemistry 142. Day 6. Remaining are asbestos floor tile/mastic and asbestos elbows/joints. All counter-tops and transite panels are removed.


Tue 8-30-2016. Chemistry 142. Day 5.

Suspicious confirmation e-mail was confirmed sent from HR so I enrolled in Project Management Class at Piedmont.


Mon 8-29-2016. Sick day.


Payday 9-9.

1st Week Aug 22 || M 8 | T 8 | W 9 | Th 9 | F 9  || Sa 6 | Su = 9 OT.

2nd Week Aug 29 || M - | T 8 | W 8 | Th 8 | F 10 || Sa   | Su = 2 OT 8 UL.

Payday 8-26.

1st Week Aug  8 || M 8 | T 8 | W 8  | Th - | F 8 || Sa | Su 3 = 8 UL 3 OT.

1st Week Aug  8 || M 8 | T 8 | W 8  | Th 3 | F 8 || Sa | Su 0 = 5 UL.

2nd Week Aug 15 || M 8 | T 8 | W 11 | Th 9 | F 5 || Sa | Su = 3 UL 4 OT.

2nd Week Aug 15 || M 8 | T 8 | W 8  | Th 9 | F 8 || Sa | Su = 1 OT.

Payday 8-12.

1st Week Jul 25 || M 8   | T 8 | W 8  | Th 8 | F 8 || Sa | Su = Vacation.

2nd Week Aug  1 || M 8.5 | T 8 | W 11 | Th 8 | F 8 || Sa | Su = 3.5 OT.

Explanation Week 29 to avoid leave and overtime in same week.