Fri 6-17-2016. Chemistry 166. Floor tile / mastic. Neg Air #2 carbon filter used because no ventilation and left running through the weekend.
Thornton A238. Drill exploratory holes in floor and ceiling.
Thu 6-16-2016. Ominous sky becomes sunshine and oppresive heat.
Carruthers Hall renovation at main entrance. Asbestos floor tile / mastic under partition walls from previous renovations. To be scheduled.
Campbell Hall School of Architecture. Asbestos glue "hockey pucks".
Wed 6-15-2016. Chemistry 166, 410A, 410B. Asbestos floor tile / asbestos mastic / asbestos counter tops.
McCormick Observatory. Assist to dispose of lead paint waste and store blue barrel of chemical soaked paper.
SDS for Peel Away 7.
Tue 6-14-2016. Chemistry 409 and 166. Carpet / tile / mastic. Sample Job Hazard Analysis.
Mon 6-13-2016. Chemistry 410A, 410B and 409. Carpet / tile / mastic.
Payday 7-1.
1st Week Jun 13 || M 8 | T 8 | W 8 | Th 8 | F 8 || Sa | Su = 40 hour work week.
2nd Week Jun 20 || M | T | W | Th | F || Sa | Su =
Payday 6-17.
1st Week May 30 || M 8 | T 8 | W 0 | Th 8 | F 8 || Sa | Su = 8 UL.
2nd Week Jun 6 || M 8 | T 8 | W 8 | Th 8 | F 8 || Sa | Su = 40 hour work week.
Payday 6-3.
1st Week May 16 || M 8 | T 9.5 | W 12 | Th 11 | F 11.5 || Sa 11 | Su 11 = 34 OT.
2nd Week May 23 || M 8 | T 8 | W 8 | Th 4 | F 0 || Sa 0 | Su 0 = 12 UL.
The correction occurs only when leave and overtime occur in the same week, not 2-week pay period. If it did, I would
opt for keeping the 12 hours UL and getting only 22 hours OT. Explanation Week 29.