Blair Hawkins' Work Journal
Fri 6-10-2016. Help Sign Shop prepare for Reunions Weekend.
Thu 6-9-2016. Corner Building basement. 2 areas floor tile / mastic.
Help Sign Shop install 2 crosswalk signs. Setup for Alumni weekend.
Wed 6-8-2016. Zehmer 230. Asbestos glazing for cracked window.
Tue 6-7-2016. More lead to scrapyard. 2017 pounds + 2700 = 4717 pounds lead from MR-4 1035. Nothing left at MR-4.
Corner building. Vynil floor tile under old cabinets and partition walls.
Kerchoff 116. Enlarge hole in plaster ceiling. Hang glovebag on elbow of asbestos pipe insulation.
Mon 6-6-2016. MR-4 Rm 1035. Old X-ray room. Lead panels with black mastic to sheetrock and plywood.
Ceiling grid that held lead panels. Carpet / tile / mastic.
Thornton A218. Punch a second hole in asbestos ceiling plaster for a conduit chase.
Payday 6-17.
1st Week May 30 || M 8 | T 8 | W 0 | Th 8 | F 8 || Sa | Su = 8 UL.
1st Week May 30 || M 8 | T 8 | W 0 | Th 8 | F 8 || Sa | Su = No correction.
2nd Week Jun 6 || M 8 | T 8 | W 8 | Th 8 | F 8 || Sa | Su = 40 hour work week.
2nd Week Jun 6 || M 8 | T 8 | W 8 | Th 8 | F 8 || Sa | Su = No correction.
Payday 6-3.
1st Week May 16 || M 8 | T 9.5 | W 12 | Th 11 | F 11.5 || Sa 11 | Su 11 = 34 OT.
1st Week May 16 || M 8 | T 9.5 | W 12 | Th 11 | F 11.5 || Sa 11 | Su 11 = 34 OT.
2nd Week May 23 || M 8 | T 8 | W 8 | Th 4 | F 0 || Sa 0 | Su 0 = 12 UL.
2nd Week May 23 || M 8 | T 8 | W 8 | Th 4 | F 0 || Sa | Su = No correction.
The correction occurs only when leave and overtime occur in the same week, not 2-week pay period. If it did, I would
opt for keeping the 12 hours UL and getting only 22 hours OT. Explanation Week 29.