Sat 1-16-2016. Brooks Hall basement. Open 4 holes in plaster ceiling containing trace asbestos.

Old Med School 3774. Remove asbestos transite panels from cabinet under fume hood.


Fri 1-15-2016. Thornton A008.

Brooks Hall.


Thu 1-14-2016. Annual re-certification for Asbestos Supervisor Refresher Course.

Leake Building utility room. Remove 2 floor tiles.


Wed 1-13-2016. Chemistry 237. Partial containment for pipe repair above drop ceiling where spray-on asbestos is located.

Thornton A008. Demolition of partition walls. Joint compound has trace asbestos.

Supply unit.


Tue 1-12-2016. Chemistry 237.

Thornton A008.


Mon 1-11-2016. Thornton A237. Remove carpet, floor tile. Encapsulate. Neg Air #1.