Blair Hawkins' Work Journal
Fri 5-27-2016. Day off.
Thu 5-26-2016. Pavilion 5 crawl space. Spread special plastic for later plumbing work.
Future job. Chemistry 166, 409, 410A, 410B. Carpet / asbestos tile / asbestos mastic.
Wed 5-25-2016. MSB 2614. Remove wet ceiling tile for leaking pipe, fiberglass insulation. The spray-on above
the drop ceiling is asbestos.
Thornton A218. Remove small section of carpet / tile / mastic for drilling holes in floor. Create a hole in asbestos plaster ceiling
above the drop ceiling.
Campbell Hall School of Architecture. 4thh floor under renovation. Remove asbestos counter top and sink with acoustic spray-on
asbestos on under side to dampen the sound of a dripping faucet.
Pavilion 5 crawl space for Thursday. Spread special plastic for later plumbing work.
MR-4 Room 1035. Deliver 4 disposal bags, some plastic, 2 piece rolls of red tape. The lead panels in the wall are coupled
with plywood and black mastic said to be negative for asbestos.
Tue 5-24-2016. MR-4 Room 1035. Remove lead panels glued to sheetrock panels above drop ceiling,
where spray-on is cellulose, not asbestos. Next phase is to remove lead panels in the walls.
Mon 5-24-2016. Bonny Castle. Remove lead paint 3 plywood panels under kitchen awning.
Create exploratory hole in asbestos plaster ceiling.
Payday 6-3.
1st Week May 16 || M 8 | T 9.5 | W 12 | Th 11 | F 11.5 || Sa 11 | Su 11 = 34 OT.
1st Week May 16 || M 8 | T 9.5 | W 12 | Th 11 | F 11.5 || Sa 11 | Su 11 = 34 OT.
2nd Week May 23 || M 8 | T 8 | W 8 | Th 4 | F 0 || Sa 0 | Su 0 = 12 UL.
2nd Week May 23 || M 8 | T 8 | W 8 | Th 4 | F 0 || Sa | Su = No correction.
The correction occurs only when leave and overtime occur in the same week, not 2-week pay period. If it did, I would
opt for keeping the 12 hours UL and getting only 22 hours OT.
Payday 5-20.
1st Week May 2 || M 8 | T 8 | W 8 | Th 8 | F 8 || Sa | Su = 40 hour work week.
1st Week May 2 || M 8 | T 8 | W 8 | Th 8 | F 8 || Sa | Su = No correction.
2nd Week May 9 || M 8 | T 8 | W 8 | Th 0 | F 8 || Sa 8 | Su = 8 UL | 8 OT.
2nd Week May 9 || M 8 | T 8 | W 8 | Th 8 | F 8 || Sa | Su = 40 hour work week.
Week || M | T | W | Th | F || Sa | Su =