Tue 6-21-2016. Campbell 402 School of Architecture. Demo for asbestos glue hockey pucks.
First photo 7:21 am. Possible tornado in afternoon photos 3:31 | 3:34 | 3:35 video 43sec | 3:36 pm.
Mon 6-20-2016. Campbell 402 School of Architecture. Remove plaster chase because of asbestos glue hockey pucks.
Chemistry 166. Neg Air #2 sealed up and put in storage with dirty particulate filter and fume-soaked carbon filter. Must be changed before used again. Can still smell fumes in the area. Should have installed new carbon filter Friday and let run over the weekend. Carbon filter was probably saturated Friday and became a source for fumes blown through the HEPA filter.
Payday 7-1.
1st Week Jun 13 || M 8 | T 8 | W 8 | Th 8 | F 8 || Sa | Su = 40 hour work week.
2nd Week Jun 20 || M 8 | T 8 | W 8 | Th 5 | F 8 || Sa | Su = 3 UL.
Payday 6-17.
1st Week May 30 || M 8 | T 8 | W 0 | Th 8 | F 8 || Sa | Su = 8 UL.
2nd Week Jun 6 || M 8 | T 8 | W 8 | Th 8 | F 8 || Sa | Su = 40 hour work week.
Payday 6-3.
1st Week May 16 || M 8 | T 9.5 | W 12 | Th 11 | F 11.5 || Sa 11 | Su 11 = 34 OT.
2nd Week May 23 || M 8 | T 8 | W 8 | Th 4 | F 0 || Sa 0 | Su 0 = 12 UL.
The correction occurs only when leave and overtime occur in the same week, not 2-week pay period. If it did, I would
opt for keeping the 12 hours UL and getting only 22 hours OT. Explanation Week 29.