Blair Hawkins' Work Journal
Fri 8-5-2016. Private Clinics Pediatrics CDW 3601. Floor carpet / tile / mastic.
Hospital West Ground floor adjacent 4-8-2016 glovebag. Set up for one glovebag for suspected leak that was canceled.
Thu 8-4-2016. Private Clinics Pediatrics CDW 3601. Floor carpet / tile / mastic.
Finish yesterday's overtime. Move electric panel and table top to container. Separate 2 large cabinets into 4 to fit through door and to be discarded.
Wed 8-3-2016. Private Clinics Pediatrics CDW 3601. Floor carpet / tile / mastic.
Overtime bait and switch. Bait with 10 rooms of furniture at hospital. Switch to Facilities lunchroom lockers to outside container.
Tue 8-2-2016. Help Moving Crew with furniture and surplus. Leake Building, Rotunda, Old Ivy Road, Physics.
Mon 8-1-2016. Chemistry 235. Replace ceiling tiles where asbestos is located above drop ceiling.
Physics 117 one glovebag. Physics 116 twelve glovebags. Physics 118 for tomorrow.
Ripper-Stripper and 2 tile bars are picked up from Dell 1.
Payday 8-12.
1st Week Jul 25 || M 8 | T 8 | W 8 | Th 8 | F 8 || Sa | Su = Vacation.
2nd Week Aug 1 || M 8.5 | T 8 | W 11 | Th 8 | F 8 || Sa | Su = 3.5 OT.
Explanation Week 29 to avoid leave and overtime in same week. Problem occurs when time keeper accounts for all 8 hours in a weekday. If you input only hours worked, the problem of taking your leave at half price does not occur.