Blair Hawkins' Work Journal
Sat 11-19-2016. Jordan 3-15. To remove pipes above drop ceiling into 4th floor renovation. Above drop ceiling is asbestos. 4th floor is cellulose (photos on 11-18). Build partial plastic containment. Stand by for vacuuming. Take down plastic.
Lloyd Building 1515 University Ave. Complete. Cut 8 registers 4 in x 4 ft for HVAC.
Fri 11-18-2016. Lee St. Parking Garage. Count signs that are faded from the sun.
Carruthers at 149A access through 151. If carpet removal contractor encounters floor tile, contact us.
Jordan 3-15. View above on 4th floor. Build partial containment to remove these pipes from above drop ceiling.
Vacuum Tommy's space.
Status photos.
Thu 11-17-2016. Help Sign Shop. Install signs at UVA Inn at Darden, Ruffin Hall, Mimosa Ct. Pick up load of recycled posts from Gaston & Wyatt in Carlton Business Park.
Wed 11-16-2016. Carruthers Hall. 2 glovebags asbestos pipe insulation.
Jordan 3-15. Sat 6 a.m. Build and take down partial plastic containment for plumbers. Similar to 10-2-2015 same room. Also Saturday Lloyd Hall registers for HVAC are cut into floor.
Help Sign Shop. Move crosswalk signs to edge of street at McLeod Hall. Last installed on 8-23 and on 5-4.
Tue 11-15-2016. Rotunda North Face. Install 10 double-sized benches.
Mon 11-14-2016. Sick Day.
1st Week Nov 14 || M - | T 8 | W 8 | Th 8 | F 8 || Sa 8 |Su = 8 UL 8 OT.
1st Week Nov 14 || M (8) | T 8 | W 8 | Th 8 | F 8 || Sa (-) |Su = 40 Hours.
2nd Week Nov 21 || M | T | W H | Th H | F H || Sa|Su =