Fri 11-11-2016. Chemistry Chase first floor. One glovebag to remove asbestos joint and elbow and fiberglass pipe insulation. Last in chase on 8-10.
Lloyd Building 1515 University Ave. Investigate how tongue-and-groove orginal floor will come up. Get crew to move scaffolding for afternoon. Last work on Sat 10-22 photo essay.
Help assemble benches in the afternoon. Pick up and deliver boxes.
Thu 11-10-2016. Jordan 3-93. Build and take down plastic partial containment to replace a valve. Asbestos sprayed onto original ceiling and falling onto drop ceiling, black mastic and mag joints. Otherwise fiberglass pipe insulation. Similar containment on 10-2-2015 and dropped off HEPA vacuum for the plumbers on 6-3-2016.
Wed 11-9-2016. Sick Day.
Tue 11-8-2016. Old Medical School MED 4893 and 4893A Pathology Library. Abate asbestos pipe insulation in chase for line from hall circuit box. Lead paint area.
Mon 11-7-2016. Old Medical School MED 4893 and 4893A Pathology Library. Abate asbestos pipe insulation in chase for line from hall circuit box.
New HEPA installed for vacuum that failed on 9-22.
1st Week Oct 31 || M 8 | T 8 | W 8 | Th 5 | F - || Sa|Su = 11 UL.
2nd Week Nov 7 || M 8 | T 8 | W - | Th 8 | F 8 || Sa|Su = 8 UL.