Fri 11-11-2016. Chemistry Chase first floor. One glovebag to remove asbestos joint and elbow and fiberglass pipe insulation. Last in chase on 8-10.

Lloyd Building 1515 University Ave. Investigate how tongue-and-groove orginal floor will come up. Get crew to move scaffolding for afternoon. Last work on Sat 10-22 photo essay.

Help assemble benches in the afternoon. Pick up and deliver boxes.


Thu 11-10-2016. Jordan 3-93. Build and take down plastic partial containment to replace a valve. Asbestos sprayed onto original ceiling and falling onto drop ceiling, black mastic and mag joints. Otherwise fiberglass pipe insulation. Similar containment on 10-2-2015 and dropped off HEPA vacuum for the plumbers on 6-3-2016.


Wed 11-9-2016. Sick Day.


Tue 11-8-2016. Old Medical School MED 4893 and 4893A Pathology Library. Abate asbestos pipe insulation in chase for line from hall circuit box. Lead paint area.


Mon 11-7-2016. Old Medical School MED 4893 and 4893A Pathology Library. Abate asbestos pipe insulation in chase for line from hall circuit box.

New HEPA installed for vacuum that failed on 9-22.


Payday 11-18. Timesheets.

1st Week Oct 31 || M 8 | T 8 | W 8 | Th 5 | F - || Sa|Su = 11 UL.

2nd Week Nov  7 || M 8 | T 8 | W - | Th 8 | F 8 || Sa|Su =  8 UL.


Home | Training | Week 56 | 55 | 54 | 53 | 52 | 51 | 50 | 49 | 48 | 47 | 46 | 45 | 44 | 43 | 42 | 41 | 40 | 39 | 38 | 37 | 36 | 35 | 34 | 33 | 32 | 31 | 30 | 29 | 28 | 27 | 26 | 25 | 24 | 23 | 22 | 21 | 20 | 19 | 18 | 17 | 16 | 15 | 14 | 13 | 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 1&2 | Archives