Blair Hawkins' Work Journal
Fri 12-9-2016. Towers 1222 JPA. Deliver boxes. Remove signs first floor 1201 and break area. Travel to Crozet for snow blowers, salt spreaders, snow shovels, leaf blowers, poles.
Thu 12-8-2016. UVA SPEED Clinic. Replace 3 parking signs.
Help build the frames for 5 large signs for Wise campus.
Wed 12-7-2016. Alden House. Vacuum windows and floors.
Tue 12-6-2016. Alden House. Vacuum windows and floors.
Mon 12-5-2016. Olsson Hall men's room. Complete.
Install banner at central grounds (Newcomb) garage and UVA bookstore.
Replace STOP sign on Rugby at Beta Bridge.
Install 5 signs at Culbreth Theater. Exit right. Exit left, 3 "No Access."
Install Rugby street sign at Rugby and Lambeth.
Clean up shop.
1st Week Nov 28 || M 8 | T 8 | W 8 | Th 8 | F 8 || Sa 4 |Su = 4 OT.
2nd Week Dec 5 || M 8 | T 8 | W 8 | Th 8 | F 8 || Sa|Su = 40 Hours.