Blair Hawkins' Work Journal
Sat 1-7-2017. Come in early for the snow.
Annual Asbestos Refresher Class.
Fri 1-6-2017. Complete Mechanical Engineering 310. Floor tile / Mastic.
MR4 hallway near Room 2035. Floor tile.
Kluge Ruhe on Pantops. Pick up sink with acoustical asbestos sprayed-on (example shown).
Purchase winter safety work boots from Redwing.
Thu 1-5-2017. Mechanical Engineering 310. Floor tile / Mastic.
Printshop at Fontana. Small area of floor tile.
Wed 1-4-2017. Another day of moving furniture.
Tue 1-3-2017. Pick up work van with new sealed divider for cargo section.
Move more furniture.
Mon 1-2-2017. New Year's Holiday.
1st Week Dec 26 || M H | T - | W - | Th - | F - || Sa|Su = 32 UL.
2nd Week Jan 2 || M H | T 8 | W 8 | Th 8 | F 9 || Sa 8 |Su = 9 OT.